| Buy Now |
Digital Flowmeter with Data Logger Installed |
| 9090-DAT |
1/2" Pipe (Schedule 40 iron) Range: 1-90 SCFM with Drill Guide |
| 9090-M3-DAT |
1/2" Pipe (Schedule 40 iron) Range: 2-153 m3/hr with Drill Guide |
| 9091-DAT |
3/4" Pipe (Schedule 40 iron) Range: 1-120 SCFM with Drill Guide |
| 9091-M3-DAT |
3/4" Pipe (Schedule 40 iron) Range: 2-204 m3/hr with Drill Guide |
| 9092-DAT |
1" Pipe (Schedule 40 iron) Range: 1-160 SCFM with Drill Guide |
| 9092-M3-DAT |
1" Pipe (Schedule 40 iron) Range: 2-272 m3/hr with Drill Guide |
| 9094-DAT |
1-1/2" Pipe (Schedule 40 iron) Range: 2-200 SCFM with Drill Guide |
| 9094-M3-DAT |
1-1/2" Pipe (Schedule 40 iron) Range: 3-340 m3/hr with Drill Guide |
| 9095-DAT |
2" Pipe (Schedule 40 iron) Range: 3-350 SCFM with Drill Guide |
| 9095-M3-DAT |
2" Pipe (Schedule 40 iron) Range: 5-595 m3/hr with Drill Guide |
| 9096-DAT |
2-1/2" Pipe (Schedule 40 iron) Range: 5-500 SCFM with Drill Guide |
| 9096-M3-DAT |
2-1/2" Pipe (Schedule 40 iron) Range: 8-850 m3/hr with Drill Guide |
| 9097-DAT |
3" Pipe (Schedule 40 iron) Range: 12-1200 SCFM with Drill Guide |
| 9097-M3-DAT |
3" Pipe (Schedule 40 iron) Range: 20-2039 m3/hr with Drill Guide |
| 9098-DAT |
4" Pipe (Schedule 40 iron) Range: 20-2000 SCFM with Drill Guide |
| 9098-M3-DAT |
4" Pipe (Schedule 40 iron) Range: 34-3398 m3/hr with Drill Guide |
| 9090-DG-DAT |
1/2" Pipe (Schedule 40 iron) Range: 1-90 SCFM without Drill Guide |
| 9090-M3-DG-DAT |
1/2" Pipe (Schedule 40 iron) Range: 2-153 m3/hr without Drill Guide |
| 9091-DG-DAT |
3/4" Pipe (Schedule 40 iron) Range: 1-120 SCFM without Drill Guide |
| 9091-M3-DG-DAT |
3/4" Pipe (Schedule 40 iron) Range: 2-204 m3/hr without Drill Guide |
| 9092-DG-DAT |
1" Pipe (Schedule 40 iron) Range: 1-160 SCFM without Drill Guide |
| 9092-M3-DG-DAT |
1" Pipe (Schedule 40 iron) Range: 2-272 m3/hr without Drill Guide |
| 9094-DG-DAT |
1-1/2" Pipe (Schedule 40 iron) Range: 2-200 SCFM without Drill Guide |
| 9094-M3-DG-DAT |
1-1/2" Pipe (Schedule 40 iron) Range: 3-340 m3/hr without Drill Guide |
| 9095-DG-DAT |
2" Pipe (Schedule 40 iron) Range: 3-350 SCFM without Drill Guide |
| 9095-M3-DG-DAT |
2" Pipe (Schedule 40 iron) Range: 5-595 m3/hr without Drill Guide |
| 9096-DG-DAT |
2-1/2" Pipe (Schedule 40 iron) Range: 5-500 SCFM without Drill Guide |
| 9096-M3-DG-DAT |
2-1/2" Pipe (Schedule 40 iron) Range: 8-850 m3/hr without Drill Guide |
| 9097-DG-DAT |
3" Pipe (Schedule 40 iron) Range: 12-1200 SCFM without Drill Guide |
| 9097-M3-DG-DAT |
3" Pipe (Schedule 40 iron) Range: 20-2039 m3/hr without Drill Guide |
| 9098-DG-DAT |
4" Pipe (Schedule 40 iron) Range: 20-2000 SCFM without Drill Guide |
| 9098-M3-DG-DAT |
4" Pipe (Schedule 40 iron) Range: 34-3398 m3/hr without Drill Guide |